Headquarters Extension Now Complete

Our new extension to our office and production headquarters has introduced an additional 1000 sq ft of high specification office space, along with an additional 2000 sq ft of production and storage capacity.
Current office space now offers 3,200 sq ft, supported by our dual production space of approximately 13,500 sq ft.
The offices have been fitted out with the latest computer and data wiring systems, which are integrated directly to our dual plasma and coil line manufacturing facility via our 3D CAD CAM software.
The production facility is now equipped with two plasma and coil line systems, supported by the latest ductwork manufacturing machinery. Latest acquisition to our workshops are a laser controlled soft ware integrated Brake Press along with a Hydraform Power Flanger for more heavy duty steel fabrications.
This space enables the recruitment programme to commence and will create the required space for us to continue our expansion programme through 2008 and beyond.

New conference facilitiesThis space enables the recruitment programme to commence and will create the required space for us to continue our expansion programme through 2008 and beyond.
The additional benefits of the extension will further enhance the value of our freehold headquarters as shown in our holding company Gould Holdings Ltds balance sheet for 2007.

